Real PulseDubai off-plan status from the DLD register
Terra Gardens in Dubai South, Dubai Active

Handover date and construction progress

Terra Gardens

DLD project no. 4160 · DWTC Emaar LLC · Madinat Al Mataar (Dubai South)

Filed handover 31 Oct 2029
ActiveEscrow account
DeveloperDWTC Emaar LLCDubai South, Dubai

Last read from the register: 29 November 2026

Quick answer

On 29 November 2026, the Dubai Land Department register lists Terra Gardens (DLD project no. 4160) by DWTC Emaar LLC in Madinat Al Mataar (Dubai South) as active, 3.6% built, with completion filed for 31 October 2029. That date has not passed: it is 35 months away. An escrow account is registered for it, so buyers' payments are held in an account ring-fenced for construction under Dubai Law No. 8 of 2007.

More detail

Terra Gardens is under construction on the register at 3.6%, 96.4 percentage points short of 100%, on a filed schedule of 42 months from 17 Apr 2026 to 31 Oct 2029 of which 7 months have passed.

561Units registered
AED 557.7MRegistered value
17 Apr 2026Filed start date
4160DLD project no.

Schedule vs construction

Filed schedule elapsed17%
Today · 29 Nov 2026
Filed start17 Apr 2026Filed completion31 Oct 2029
% built (register)3.6%
0%100%
35 months to filed dateFiled schedule 42 months

Plain arithmetic from the register's filed dates and % built, not a forecast.

Register checks

How Terra Gardens has changed since 1 August 2026

Real Pulse compared 77 readings of the register for Terra Gardens from 1 Aug 2026 to 29 Nov 2026 and found 1 change:

% built on the register, 1 Aug 2026 to 29 Nov 2026
  1. % built rose 0.1% 3.6%
  2. First reading 77 readings to 29 Nov 2026
All changes as a table
Recorded onWhat changedFromToPrevious reading
8 Nov 2026% built0.1%3.6%7 Nov 2026

Each change is dated to the first reading that shows it; it happened after the previous reading.

Pace on the register (arithmetic, not a forecast)

In percentage points of % built per month. These are sums on the register's own figures for Terra Gardens, not a forecast of when it will be handed over. The DLD updates the percentage after site inspections, so it moves in steps rather than smoothly.

Madinat Al Mataar on the register

75Projects on the register
11Past filed date
27.9%Median % built*

Projectsof which past filed dateTerra Gardens’s bin

Projects in Madinat Al Mataar by % built, in bins of 10 points (0–10 includes 0%). *Median of 32 active projects between 0% and 100%.

DWTC Emaar LLC on the register

2Projects
2Active
0Finished
0Past filed date
3.6%Median % built*

Projects filed under the legal name Dwtc Emaar LLC. *Median of its 1 active projects between 0% and 100%.

Full register record (all fields)

StatusActive (ACTIVE)
% built3.6%
Filed completion date31 October 2029
Filed start date17 April 2026
Units561
Registered valueAED 557,688,529
Escrow accountYes, registered
Developer (legal name)DWTC EMAAR L.L.C
Area (register district)Madinat Al Mataar (Dubai South)
Name on the registerTerra Gardens
DLD project no.4160
Register descriptionThe project consists of 2 buildings - B+G+12 a shared basement and a shared ground floor, in addition to two residential buildings with 12 floors plus a roof each along with 8 townhouses. The project includes a total of 560 residential units.

Questions about Terra Gardens

What is the handover date of Terra Gardens?

The Dubai Land Department register shows a filed completion date of 31 October 2029 for Terra Gardens (read 29 Nov 2026). This is the date the developer filed with the DLD, not a contractual handover date; the date in a buyer's sale and purchase agreement is the one that applies to that buyer.

How much of Terra Gardens is built?

Terra Gardens is 3.6% built according to the DLD register on 29 Nov 2026. It was 0.1% on 1 Aug 2026. The DLD sets this figure after inspecting the site.

Is Terra Gardens delayed?

Not on the register's figures: Terra Gardens' filed completion date of31 Oct 2029 has not passed, and it did not change in the readings from 1 Aug 2026 to 29 Nov 2026.

Does Terra Gardens have an escrow account?

Yes. The DLD register shows an escrow account for Terra Gardens. Under Dubai Law No. 8 of 2007, buyers' payments for an off-plan project go into an escrow account ring-fenced for its construction. An escrow account does not guarantee that a project will be completed.

Who is the developer of Terra Gardens?

The register lists DWTC Emaar LLC as the developer of Terra Gardens; the legal name as filed is DWTC EMAAR L.L.C.

Where is Terra Gardens?

The register places Terra Gardens in Madinat Al Mataar, the register district for Dubai South. It is registered with 561 units.

Source: DLD project register via the Dubai open data gateway, read 29 November 2026. Method.